1. [多选题]Which of the following steps are necessary in order to add a new VLAN to the Ezonexam switched network? (Select all that apply)
A. Create the VLAN.
B. Name the VLAN.
C. Configure an IP address for the VLAN.
D. Add the desired ports to the new VLAN.
E. Add the VLAN to the VTP domain.
2. [多选题]The LAN needs are expanding at the Ezonexam corporate office, which is quickly growing. You are instructed to enlarge the area covered by a single LAN segment on the Ezonexam network.Which of the following are layer 1 devices that you can use? (Choose all that apply.)
A. A switch
B. A router
C. A network adapter card
D. A hub
E. A repeater
3. [单选题]命令ip nat pool aaa 192.1.1.2 192.1.1.10 netmask 255.255.255.0的作用是()
A. 指定可访问地址
B. 定义地址池
C. 指定路由
D. 定义哪些地址可以进行地址转换