以下关于软件构件及其接口的叙述,错误的是______。

  • 下载次数:
  • 支持语言:
  • 765
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机
  • 【名词&注释】

    新员工(new employee)、不作为(omission)、基本概念(basic concept)、行政人员(administrative staff)、不适感(malaise)、隔音墙、不允许(not allow)、运行状态下(move state)、之所以(the reason that)

  • [单选题]以下关于软件构件及其接口的叙述,错误的是______。

  • A. 构件是软件系统中相对独立且具有一定意义的构成成分
    B. 构件在容器中进行管理并获取其属性或者服务
    C. 构件不允许(not allow)外部对所支持的接口进行动态发现或调用
    D. 构件可以基于对象实现,也可以不基于对象实现

  • 查看答案&解析 点击获取本科目所有试题
  • 举一反三:
  • [单选题]安森工业集团的新雇员抱怨由安森工厂内噪音过大而引起的不适。然而有经验的安森老雇员却没有任何这种不适,虽然安森工厂要对其雇员的健康负责,它还是决定不向新员工发耳塞。安森工厂的理由是不使用耳塞,新员工会很快适应这种噪音。以下哪项如果正确,指出安森工厂决定不发耳塞给新员工是错误的?( )
  • A. 老雇员之所以(the reason that)没有不舒适的感觉是因为工厂噪音已经导致他们的听力有所下降。
    B. 许多受采访的新雇员说他们不愿上班时戴耳塞。
    C. 向所有新雇员分发耳塞减少噪声对员工影响的效果不如改换使用噪音比较小的机器效果好。
    D. 因为安森工厂的噪音被隔音墙吸收,公司行政人员在办公室内听不见噪音。

  • [多选题]试题(71)~(75)The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project team's efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forward.
  • A. improvementopportunities
    B. logicalmodel
    C. systemrequirements
    D. systemarchitecture
    E. a user manual
    F. an analysis strategy
    G. an analysis use case
    H. a design user case
    I. project scope definition
    J. prob,lems analysis
    K. decisionanalysis
    L. requirementsgathering
    M. dataandprocesses
    N. systeminfrastructures
    O. externalagents
    P. systemsoftware
    Q. requirementsstatement
    R. designspecification
    S. systemproposal
    T. project charter

  • [多选题]在创建工作分解结构的过程中,项目相关人员要______。
  • A. 进行时问估算和成本估算
    B. 执行WBS
    C. 对WBS给予确认并对此达成共识
    D. 编制绩效报告