[单选题]在项目进度管理中,常用______来安排工作顺序。
A. 进度曲线法
B. 网络图法
C. 直方图法(histogram method)
D. 相关图法
查看答案&解析
举一反三:
[单选题]
B. 框图
C. 程序
D. 数据结构
A. 模块说明书B. 框图
B. 程序
C. 数据结构
[多选题]BGP is an inter-autonomous system routing protocol; it is designed to be used between multiple autonomous ( ) . BGP assumes that routing within an autonomous system is done by an intra-autonomous system routing protocol.BGP does not make any assumptions about intra-autonomous system ( ) protocols employed by the various autonomous systems. Specifically, BGP does not require all autonomous systems to run the same intra-autonomous system routing protocol. BGP is a real inter-autonomous system routing protocol. It imposes no constraints on the underlying Internet topology. The information exchanged via BGP is sufficient to construct a graph of autonomous systems connectivity from which routing loops may be pruned and some routing ( ) decisions at the autonomous system level may be enforced. The key feature of the protocol is the notion of Path Attributes. This feature provides BGP with flexibility and expandability. Path ( ) are partitioned into well-known and optional. The provision for optional attributes allows experimentation that may involve a group of BGP ( ) without affecting the rest of the Internet. New optional attributes can be added to the protocol in much the same fashion as new options are added to the Telnet protocol, for instance.
A. routers
B. systems
C. computers
D. sources
[多选题]项目范围管理计划的主要内容和作用是______。
A. 描述并记载了范围基准计划,以帮助范围决策的制订
B. 分解了项目的可交付成果
C. 描述了如何在项目中实现范围变更,以及如何管理项目的范围
D. 描述了成本和时间估算如何成为项目范围变更的组成部分(part)