【导读】
不凡考网发布2021计算机思科认证证书冲刺密卷多选题正确答案(08.21)相关信息,更多2021计算机思科认证证书冲刺密卷多选题正确答案(08.21)的相关资讯请访问不凡考网计算机类考试频道。
1. [多选题]There are 2 switches in the Ezonexam LAN, with no routers. Ports 1, 2 & 3 are assigned to VLAN 1 in switch 1 and 2 and ports 4, 5 & 6 are assigned to VLAN 2 in both switches. These two switches are connected together via a trunked link. Which of the conditions below would verify trunk and VLAN operation? (Select all valid answers)
A. Host 1 on VLAN 1 can ping Host 2 on VLAN 1
B. Host 1 on VLAN 1 can ping Host 4 on VLAN 2
C. Host 1 on VLAN 1 can not ping Host 2 on VLAN 1
D. Host 4 on VLAN 2 can not ping Host 1 on VLAN 1
E. Host 4 on VLAN 2 can ping Host 2 on VLAN 2
2. [单选题]TCP23是()协议端口号;UDP69是()端口号;TCP80是()端口号。
A. TELNET FTP HTTP
B. FTPT FTP HTTP
C. TELNET TFTP HTTP
D. TELNET DNS HTTP